Out back is now a shell of its former self.
In the first few days, flooring has come up, and walls have come off.
Ruby and Zahra go exploring. The original doorway to the top floor
has been removed, and the brickwork exposed.
Looking from the top floor - all the original brickwork to the left, which has been
covered for years, will ultimately be sandblasted and varnished.
Downstairs seems to currently be acting as a holding area for all the rubble and
rubbish coming down from upstairs!
This neat little cubby in the basement is soon to become the main office, while
the rest of the basement will be converted into a staff break room.
Here's a sneak preview of some of the lovely new industrial fixtures and fittings
which will feature heavily in Boilerhouse's new look.
More rubble downstairs, while Felix shows off the new site from outside.
Be sure to check back soon for more updates and previews as the work continues!